Clients / Projects

Our Clients

Our Projects

Procurement and Construction for Upgradation of Piping works for Train 3 Decoupling Modification in 11 locations

Client: ADNOC GAS O&M

Status: ongoing

Integrated Civil Works at Das - Refurbishment works at Industrial areas of DAS Island

Client: ADNOC GAS O&M

Status: ongoing

Procurement and Construction works for Replacement of Corroded Studs & Bolts in HST Fire Water Pump House & Firewater Network

Client: ADOC

Status: ongoing

Engineering, Procurement and Construction works for
1) Process Condensate utilization piping works.
2) Ammonia Water Interconnection piping works.
3) Urea Solution Interconnection piping works.

Client: FERTIL (ADNOC Fertilizers)

Status: ongoing

Procurement and construction at 6 locations. Civil, Structural, Piping, Electrical and Instrumenation Works. All the Tie-in Works to be carried out during major turn around 1st Quarter 2025.

Client: Borouge

Status: ongoing

Procurement and construction at 12 locations. Civil, Structural, Piping, Electrical and Instrumenation Works. All the Tie-in Works to be carried out during major turn around 1st Quarter 2025.

Client: Borouge

Status: ongoing

Engineering, Procurement and Construction works in ADNOC Refining Ruwais Plant which includes all the associated works from prefabrication/installation till pre-commissioning and commissioning.

Client: ADNOC Refining

Status: ongoing

Engineering, Procurement and construction of 18 No’s of operator shelters at various locations and types in RR1 (6 Nos.), RR2 (2 Nos) and RR3 (10 Nos.).

Client: ADNOC Refining

Status: ongoing

Modification of Sea Water Intakes (SWI) Facilities to Mitigate Invasion of Jellyfish in Plants 38 & 42

Engineering, procurement and construction services to mitigate the invasion of jellyfish-like species and prevent future shutdowns of the cooling water network which includes civil, mechanical, electrical etc.

Client: ADNOC GAS O&M

Status: ongoing

Engineering, Procurement and Construction for the Replacement of MCC's (3 Nos) and LDB's (47 Nos) at Zirku Island Part-B

Scope consist of Civil Works and Electrical Works

Client: ADNOC Offshore

Status: ongoing

Replacement of Potable, Raw & Water Utility Tanks at Asseifiya Island , UZ

6 Nos. GRP tanks were installed at Asseifiya Island (ASI), UZ for Potable water, Fire/utility water and Raw water as part of AUP. Inspection was carried out and found corrosion on structural material, bolts, leaks and cracks on GRP panels. COMPANY intends to replace like to like tanks to maintain integrity of the system.

Client: ADNOC Offshore

Status: ongoing

Unloading of Clay from Clay Filters (214-D-008 A & B- Two Vessels), Transportation of Clay to RIWHF / BeAAT, Dismantling of all internals for cleaning and inspection, Clean weld joints of the distributor pipes and supports preferably by power brush and offer for inspection, Clean/Replace outlet Johnson screen, Fixing back all internals after thorough cleaning and inspection clearance, Loading of Clay as per process engineering procedure

Client: ADNOC Refining

Status: completed

Modification of civil foundations, dismantling, installation of new foundation, structural work, fireproofing, compressor commissioning assistance.

Client: Linde / BOROUGE

Status: completed

Provide the services using qualified, skilled & experienced staff for Material Inspection Services for Crude Flexibility Project

Client: ADNOC Refining

Status: ongoing

Supply of one Senior Engineer - Contract & Cost Control to ADNOC Gas for 30 Months for Turnaround Services for LNG Train Rejuvenation Project in Das Island

Client: ADNOC LNG

Status: ongoing

Service Contract for supply of Specialized Manpower to ADNOC Gas to cater the Construction works in Das Island

Client: ADNOC LNG

Status: ongoing

Supply of one controller Plant Operations to ADNOC Gas for 2 years.

Client: ADNOC LNG

Status: ongoing

Piping & Structural works of Train-1 Pre-Shutdown & Shutdown Works of ADNOC Gas Processing - Ruwais Capacity Enhancement of NGL Trains 1, 2, 3 & 4 - PROJECT NO.5289

Client: Larsen & Toubro

Status: completed

Piping & Structural works of Train-2 Pre-Shutdown & Shutdown Works of ADNOC Gas Processing - Ruwais Capacity Enhancement of NGL Trains 1, 2, 3 & 4 - PROJECT NO.5289

Client: Larsen & Toubro

Status: completed

Pipeline and Mechanical Maintenance, Building General Maintenance, Right Of Way Maintenance, Provision of Labor And Equipment, Electrical, Instrumentation and System Integration.

Client: DOLPHIN Energy

Status: ongoing

Piping works related to Offshore Well Hookups and associated, Civil, Structural, Instrumentation and Electrical Works

Client: ADNOC Offshore

Status: ongoing

Civil & Structural Maintenance and Repair works at Emirates Steel Plan Site

Client: Emirates Steel

Status: ongoing

Site Visits, Inspection, Supply and Repair Of GRE/GRP/RTR/FRP Pipelines at ADNOC Sour Gas Facility

Client: ADNOC Sour Gas

Status: ongoing

Pipeline sections replacement, In-Service Welding of Full Encirclement Sleeve, Refilling of Odorizer, Maintenance Services for Cyclone Separators, Welding/cutting & Repair Jobs at Site, Fabrication & welding works in CONTRACTOR workshop 

Client: ADNOC Gas Processing (AGP)

Status: ongoing

Package-A - EPC Package for Site Schemes of Reinjection Lines (Cladded and Inconel), Well Testing Lines (Cladded and Inconel), HP Lines (CS) in SARB-1 & SARB-2 Artificial Islands
Package-B - Civil, GRE Piping and Electrical Works for the STP Replacement in SARB-1 & SARB-2 Artificial Islands

Client: ADNOC Offshore

Status: ongoing

Engineering, Procurement and Construction Works (Piping / Mechanical / Civil / Electrical and Instrumentation / Telecom) for RSI CEP

Client: ADNOC Refining & Borouge

Status: ongoing

EPC - Main Fire Water Network System of 30", 24", 14" & 12" lines to various ENOC subsidiaries at Jabel Facilities Dubai

Client: ENOC

Status: ongoing

Procurement and Construction Services for Plant Modification Works (14 MOC’S) at RFCC Unit in Ruwais Refinery- I

Client: ADNOC Refining

Status: ongoing

ADNOC Borouge Ruwais Plant Modification works including Procurement and Construction consisting of Civil, Structural, Piping, Electrical and Instrumentation Works at 17 various locations.

Client: Borouge

Status: completed

Engineering Procurement and Construction / Refurbishment of Civil Assets at Sulphur Plant (Ruwais)

Client: ADNOC Gas Processing

Status: ongoing

Design Supply and Installation for Non-Metallic GRE/GRP/HDPE/PVC Piping and Tank at ADNOC offshore facilities.

Client: ADNOC Offshore

Status: ongoing

Design, Supply and Installation of Pressure and Non-Pressure Containment Composite Repair Works at ADNOC Offshore Facilities

Client: ADNOC Offshore

Status: ongoing

Engineering, Procurement, Fabrication and Supply of Cementing Batch Mixers (24 Nos) for ADNOC Onshore fields

Client: ADNOC Drilling

Status: ongoing

Modification of Sea Water Intakes (SWI) Facilities to Mitigate Invasion of Jellyfish in Plants 38 & 42

Engineering, procurement and construction services to mitigate the invasion of jellyfish-like species and prevent future shutdowns of the cooling water network which includes civil, mechanical, electrical etc.

Client: ADNOC Gas

Status: ongoing

Design, Procurement and Installation Works associated with Pipeline Integrity and Maintenance/Installation of Piping/Pipeline from 0.5 inch to 48 inch including Composite Wrapping at Das Island.

Client: ADNOC LNG

Status: ongoing

Dismantling, Transportation, Erection and Tie ins of Desalter 2 Nos (160 Ton) from ADR to Ruwais Refinery - 3 and 14" pipeline between crude transfer pump discharge and battery limit of desalter package including associated Civil, Electrical and Instrumentation Works

Client: ADNOC Refining

Status: completed

Procurement and Construction for Upgradation of Piping works in OAG Off Gas Piping to PI-26 at Das Island.

Client: ADNOC LNG

Status: completed

EPC Works for ASA Injection Skid and associated Civil, Piping Electrical and Instrumentation Works at ADNOC Refining Mussaffah Terminal

Client: ADNOC Refining

Status: ongoing

Engineering, Procurement and Construction for New Conveyor System at Green Coke Shipping Facility including Installation, Structural building, Electrical and Instrumentation works at Ruwais.

Client: ADNOC Refining

Status: completed

Engineering, Procurement and Construction for the Replacement of MDB's and LV DB's at Zirku Island Part-B

Client: ADNOC Offshore

Status: ongoing

Engineering, Procurement and Construction for the Replacement of Instrument Air Compressor (K-5102) at F1

Client: Fertil

Status: completed

Engineering, Procurement, Construction and Commissioning of Process Drainage System in Ruwais FERTIL Urea-1 Plant

Client: Fertil

Status: ongoing

Pipeline Integrity and Maintenance, Installation of Pipeline from 2 inch to 48 inch including Composite Wrapping Works in various areas of ADNOC Onshore Fields.

Client: ADNOC Onshore

Status: ongoing

Civil and Structural Works at SNOC Jetty including under water diving works at Hamriyah Port, Sharjah

Client: Sharjah National Oil Corporation (SNOC)

Status: completed

Modification in HDPE Fire Network and Construction of Valve Pits, Installation of New Valves to Mitigate Frequent Failures in Fire Water Network at Das Island Airport Area

Client: ADNOC Offshore

Status: ongoing

Supply and Installation of non-metallic Piping/ Pipeline (GRE-GRP-RTR-FRP-HDPE) at ADNOC Gas Processing - All Sites.

Client: ADNOC Gas Processing

Status: ongoing

Process Plant Area Lifting with Polymer Injection at Fertil Ruwais.

Client: Fertil

Status: completed

Mechanical and Piping Maintenance Works at Various ADNOC Distribution Facilities across UAE

Client: ADNOC Distribution

Status: ongoing

Electrical and Instrumentation Maintenance Works at Dolphin Energy Stations and Pipeline Corridor all over UAE

Client: Dolphin Energy

Status: ongoing

IMI CCI Engineering Services for Critical Control Valves

Provide an advanced engineering development program for imi cci Critical Control valves and predictive maintenance. Program shall includes the study for critical control valves troubleshooting with and without tools.

Client: ADNOC LNG

Status: ongoing

Pipeline Network Critical Rehabilitation Works, Emergency call out and Miscellaneous.
Maintenance Services (EPRS)

The scope of work includes Pipeline sections replacement, In-Service Welding of Full Encirclement Sleeve, Refilling of Odorizer, Maintenance Services for Cyclone Separators, Welding/cutting & Repair Jobs at Site, Fabrication & welding works in CONTRACTOR workshop. 

Client: ADNOC Gas Processing

Status: ongoing

Engineering, Procurement, Construction and Commissioning of Service Water Pump Station in Port of Fujairah.

Client: Port of Fujairah (POF)

Status: completed

Engineering, Procurement and Construction Works including Civil, Mechanical, Electrical and Instrumentation works at all Abu Dhabi Ports in UAE

Client: Abu Dhabi Ports

Status: completed

Inspection and Maintenance Services for Gas Pipeline and Stations - Total Energy Ruwais

Client: Total Energies

Status: completed

Structural integrity study and revamping of civil foundations and supports at Shams Power Plant

Client: SHAMS

Status: completed

Catalyst Replacement Services in Pipeline Network Division & Catalyst and Molecular Sieves Replacement at AGP Bu-hasa

Client: ADNOC Gas Processing

Status: ongoing

Right of Way Maintenance Works at Dolphin Energy Stations and Pipeline Corridor all over UAE.

Client: Dolphin Energy

Status: ongoing

CCM Mould Oscillation Main Inlet & Outlet Pipe Installation in SMP1

Client: Emirates Steel

Status: completed

The GRE Piping Repair Services

Repair of GRE-GRP-RTR-FRP piping and pipeline services.

Client: ADNOC Sour Gas

Status: ongoing

Procurement, Fabrication of Jacketed Piping for Restoration & Revamp of Nitrogen Plant 10 at Das Island

Client: ADNOC LNG

Status: ongoing

CO2 Reboiler Revamping in DPR1

Client: Emirates Steel

Status: completed

New CCM Cooling Bed Rakes Installation and Profile Maintenance at SMP1 at Mussaffah.

Client: Emirates Steel

Status: completed

Fabricate, Reverse Engineering, Supply & Install Hypochlorite Tank’s Manway as Das Island

Client: ADNOC LNG

Status: completed

Modification of Monorail and Strengthening of Structures for EOT Cranes at TT1 and TT2 transfer towers in Habshan Plant

Client: ADNOC Gas Processing

Status: completed

Replacement of cladded line in Process Gas Separator including Demolition and Installation of 36inch line in DPR1.

Client: Emirates Steel

Status: completed

Design, Procurement and Installation of Explosion Proof Blast Egress in Habshan-5 & Sulphur Plant.

Client: ADNOC Gas Processing

Status: completed

Engineering and Design of Electrical and Instrumentation Cables with adequacy checking of existing pipe racks.

Client: Emirates Steel

Status: completed

Procurement and installation of Electrical Power and Instrument Cables at ADNOC Gas Processing at Stacker/Reclaimer 2200 - SR2200 in RSHT (Ruwais)

Client: ADNOC Gas Processing

Status: completed

BOG - Modification works

Modification works includes civil foundation removal, installation of new foundation, structural work, fireproofing, compressor commissioning assistance.

Client: Linde

Status: ongoing

Engineering, Supply and Installation, Testing and Commissioning of Lighting System at Al Ain Zaker Depot and LPG Plant

Client: ADNOC Distribution

Status: completed

Unloading & Loading of Clay in 214-D-008A/B Clay Filter at Condensate Unit in RR-III

Client: ADNOC Refining

Status: ongoing

Automatic Ventilation Facility Supply and Installation in Urea Bulk Storage in Fertil at Ruwais.

Client: Fertil

Status: completed

Detailed Engineering for Modification of Deluge Piping in LNG Train 3 (Das Island)

Client: ADNOC LNG

Status: completed

Refurbishment of Warehouse at P&TOD – Musaffah

Refurbishment of Warehouse including solar, area development and interlock lock works etc.

Client: ADNOC Refining

Status: ongoing

Engineering, Procurement and replacement of Steel Handrails and Gratings with FRP (Non-Metallic) at Trains 1 & 2 Seawater Intake Plant 42 in Das Island

Client: ADNOC LNG

Status: ongoing

Engineering, Procurement, Construction and Commissioning of Fresh Water Pump Station including Pump Control System , Electrical and Instrumentation works and Pipeline/Piping works.

Client: Port of Fujairah (POF)

Status: completed

Fire Protection System and Big Flow Monitoring System at Musaffah Terminal.

Client: ADNOC Refining

Status: completed

Engineering, Procurement and Supply and Installation of Polishing Coalescer Vessel including associated Civil, Piping, Electrical and Instrumentation Works at PDH PSA Inlet (Ruwais)

Client: ADNOC Refining

Status: ongoing

Hydrogen Recovery Unit Piping Tie-in Works During Turnaround-2023 in FERTIL Ruwais Plant

Client: FERTIL

Status: completed

Upgradation of Hastelloy, CS and GRP/GRE Piping in Hypochlorite Plant Area at Das Island.

Client: ADNOC LNG

Status: completed

Engineering, Procurement, Construction and Commissioning of Fire Water System Upgradation including Demolition of existing Pipeline, Construction of New Valve Chambers and Installation of New GRE Pipeline.

Client: DUGAS/ENOC

Status: completed

Piping and structural works for Train-2 shutdown

Shutdown Structural and Piping Works at Ruwais Plant

Client: ADNOC Gas / Larsen & Toubro

Status: completed

Facility Infra-Structure Upgradation at ADNOC Gas Processing Plant in Ruwais.

Client: ADNOC Gas Processing

Status: completed

Replacement of High-Pressure Gas Pipeline, Residual Gas Pipeline and Pressure Gas Pipeline and associated Tie-ins in ADNOC Gas Processing at Bu-hasa.

Client: ADNOC Gas Processing

Status: completed

Design, Procurement and Installation Works associated with Pipeline integrity of 30" and 36" Gas Pipeline and ADNOC Gas Processing Habshan

Client: ADNOC Gas Processing

Status: completed

Upgradation of GRP/GRE Piping in Hypochlorite Plant (Plant-42) area at Das Island.

Client: ADNOC LNG

Status: completed

Specialist Support Services for IGD Train 2 and OAG Train 1 Turnaround 2021 - 2022 at ADNOC LNG Das Island

Client: ADNOC LNG

Status: completed

Design, Supply and Installation of Heavy-Duty Rack System in Borouge Warehouses and associated Civil Works (Ruwais)

Client: Borouge

Status: completed

Engineering, Procurement, Construction and Commissioning including Supply and Installation of Chemical Treatment System and associated Civil, Electrical and Instrumentation Works.

Client: ADNOC Refining

Status: completed

Construction of PAD-104, WB-122, WB-123 & WB-124 including Erection of equipment, Piping, Structural, Pre-commissioning and Commissioning works at Habshan.

Client: ADNOC Onshore / CPECC

Status: completed

Provision of Site Construction Support Services

Service Contracts from Contractor the in Projects division within ADNOC GAS to provide effective support to the Company in the existing and future projects portfolio at various stages to meet expected delivery time and to manage and execute the projects from inception to operations in-line with ADNOC VAP and General Engineering Standards & International Codes and Standards.

Client: ADNOC LNG

Status: ongoing

Mechanical Works (Piping & Structural) of Train-1 Pre-Shutdown & Shutdown Works of ADNOC Gas Processing - Ruwais Capacity Enhancement of NGL Trains 1, 2, 3 & 4 - PROJECT NO.5289

Piping and Structural work of NGL Train-1 Pre-Shutdown & Shutdown Works of ADNOC Gas

Client: ADNOC Gas / Larsen & Turbo

Status: ongoing

Replacement of Potable, Raw & Water Utility Tanks at Asseifiya Islannd , UZ

6 Nos. GRP tanks were installed at Asseifiya Island (ASI), UZ for Potable water, Fire/utility water and Raw water as part of AUP. Inspection was carried out and found corrosion on structural material, bolts, leaks and cracks on GRP panels. COMPANY intends to replace like to like tanks to maintain integrity of the system.

Client: ADNOC Offshore

Status: ongoing

Construction of MP-132, WB-137, WB-125 & WB-126 including Erection of Equipment, Piping, Structural, Pre-commissioning and Commissioning at Habshan

Client: ADNOC Onshore / CPECC

Status: completed

Specialist Support Services for Commissioning Services (IGD-E2 Project) at Das Island

Client: ADNOC LNG

Status: ongoing

HDPE Pipeline Integrity related works including design and procurement (50 mm to 2000 mm) at various locations.

Client: ADNOC Group

Status: ongoing

Construction of Remote Degassing Station (RDS-8 and RDS9) including prefabrication and erection of piping (CS, SS, DSS) equipment and Tie in works at Habshan field.

Client: ADNOC Onshore / CPECC

Status: completed

Pipeline and Systems Maintenance including Electrical and Instrumentation Works at Dolphin Energy Stations Pipelines all over UAE.

Client: Dolphin Energy

Status: ongoing

Procurement and Construction for Upgradation of Piping works for Train 3 Decoupling Modification in 11 locations

Client: ADNOC GAS O&M

Status: ongoing

Integrated Civil Works at Das - Refurbishment works at Industrial areas of DAS Island

Client: ADNOC GAS O&M

Status: ongoing

Procurement and Construction works for Replacement of Corroded Studs & Bolts in HST Fire Water Pump House & Firewater Network

Client: ADOC

Status: ongoing

Engineering, Procurement and Construction works for
1) Process Condensate utilization piping works.
2) Ammonia Water Interconnection piping works.
3) Urea Solution Interconnection piping works.

Client: FERTIL (ADNOC Fertilizers)

Status: ongoing

Procurement and construction at 6 locations. Civil, Structural, Piping, Electrical and Instrumenation Works. All the Tie-in Works to be carried out during major turn around 1st Quarter 2025.

Client: Borouge

Status: ongoing

Procurement and construction at 12 locations. Civil, Structural, Piping, Electrical and Instrumenation Works. All the Tie-in Works to be carried out during major turn around 1st Quarter 2025.

Client: Borouge

Status: ongoing

Engineering, Procurement and Construction works in ADNOC Refining Ruwais Plant which includes all the associated works from prefabrication/installation till pre-commissioning and commissioning.

Client: ADNOC Refining

Status: ongoing

Engineering, Procurement and construction of 18 No’s of operator shelters at various locations and types in RR1 (6 Nos.), RR2 (2 Nos) and RR3 (10 Nos.).

Client: ADNOC Refining

Status: ongoing

Modification of Sea Water Intakes (SWI) Facilities to Mitigate Invasion of Jellyfish in Plants 38 & 42

Engineering, procurement and construction services to mitigate the invasion of jellyfish-like species and prevent future shutdowns of the cooling water network which includes civil, mechanical, electrical etc.

Client: ADNOC GAS O&M

Status: ongoing

Engineering, Procurement and Construction for the Replacement of MCC's (3 Nos) and LDB's (47 Nos) at Zirku Island Part-B

Scope consist of Civil Works and Electrical Works

Client: ADNOC Offshore

Status: ongoing

Replacement of Potable, Raw & Water Utility Tanks at Asseifiya Island , UZ

6 Nos. GRP tanks were installed at Asseifiya Island (ASI), UZ for Potable water, Fire/utility water and Raw water as part of AUP. Inspection was carried out and found corrosion on structural material, bolts, leaks and cracks on GRP panels. COMPANY intends to replace like to like tanks to maintain integrity of the system.

Client: ADNOC Offshore

Status: ongoing

Provide the services using qualified, skilled & experienced staff for Material Inspection Services for Crude Flexibility Project

Client: ADNOC Refining

Status: ongoing

Supply of one Senior Engineer - Contract & Cost Control to ADNOC Gas for 30 Months for Turnaround Services for LNG Train Rejuvenation Project in Das Island

Client: ADNOC LNG

Status: ongoing

Service Contract for supply of Specialized Manpower to ADNOC Gas to cater the Construction works in Das Island

Client: ADNOC LNG

Status: ongoing

Supply of one controller Plant Operations to ADNOC Gas for 2 years.

Client: ADNOC LNG

Status: ongoing

Pipeline and Mechanical Maintenance, Building General Maintenance, Right Of Way Maintenance, Provision of Labor And Equipment, Electrical, Instrumentation and System Integration.

Client: DOLPHIN Energy

Status: ongoing

Piping works related to Offshore Well Hookups and associated, Civil, Structural, Instrumentation and Electrical Works

Client: ADNOC Offshore

Status: ongoing

Civil & Structural Maintenance and Repair works at Emirates Steel Plan Site

Client: Emirates Steel

Status: ongoing

Site Visits, Inspection, Supply and Repair Of GRE/GRP/RTR/FRP Pipelines at ADNOC Sour Gas Facility

Client: ADNOC Sour Gas

Status: ongoing

Pipeline sections replacement, In-Service Welding of Full Encirclement Sleeve, Refilling of Odorizer, Maintenance Services for Cyclone Separators, Welding/cutting & Repair Jobs at Site, Fabrication & welding works in CONTRACTOR workshop 

Client: ADNOC Gas Processing (AGP)

Status: ongoing

Package-A - EPC Package for Site Schemes of Reinjection Lines (Cladded and Inconel), Well Testing Lines (Cladded and Inconel), HP Lines (CS) in SARB-1 & SARB-2 Artificial Islands
Package-B - Civil, GRE Piping and Electrical Works for the STP Replacement in SARB-1 & SARB-2 Artificial Islands

Client: ADNOC Offshore

Status: ongoing

Engineering, Procurement and Construction Works (Piping / Mechanical / Civil / Electrical and Instrumentation / Telecom) for RSI CEP

Client: ADNOC Refining & Borouge

Status: ongoing

EPC - Main Fire Water Network System of 30", 24", 14" & 12" lines to various ENOC subsidiaries at Jabel Facilities Dubai

Client: ENOC

Status: ongoing

Procurement and Construction Services for Plant Modification Works (14 MOC’S) at RFCC Unit in Ruwais Refinery- I

Client: ADNOC Refining

Status: ongoing

Engineering Procurement and Construction / Refurbishment of Civil Assets at Sulphur Plant (Ruwais)

Client: ADNOC Gas Processing

Status: ongoing

Design Supply and Installation for Non-Metallic GRE/GRP/HDPE/PVC Piping and Tank at ADNOC offshore facilities.

Client: ADNOC Offshore

Status: ongoing

Design, Supply and Installation of Pressure and Non-Pressure Containment Composite Repair Works at ADNOC Offshore Facilities

Client: ADNOC Offshore

Status: ongoing

Engineering, Procurement, Fabrication and Supply of Cementing Batch Mixers (24 Nos) for ADNOC Onshore fields

Client: ADNOC Drilling

Status: ongoing

Modification of Sea Water Intakes (SWI) Facilities to Mitigate Invasion of Jellyfish in Plants 38 & 42

Engineering, procurement and construction services to mitigate the invasion of jellyfish-like species and prevent future shutdowns of the cooling water network which includes civil, mechanical, electrical etc.

Client: ADNOC Gas

Status: ongoing

Design, Procurement and Installation Works associated with Pipeline Integrity and Maintenance/Installation of Piping/Pipeline from 0.5 inch to 48 inch including Composite Wrapping at Das Island.

Client: ADNOC LNG

Status: ongoing

EPC Works for ASA Injection Skid and associated Civil, Piping Electrical and Instrumentation Works at ADNOC Refining Mussaffah Terminal

Client: ADNOC Refining

Status: ongoing

Engineering, Procurement and Construction for the Replacement of MDB's and LV DB's at Zirku Island Part-B

Client: ADNOC Offshore

Status: ongoing

Engineering, Procurement, Construction and Commissioning of Process Drainage System in Ruwais FERTIL Urea-1 Plant

Client: Fertil

Status: ongoing

Pipeline Integrity and Maintenance, Installation of Pipeline from 2 inch to 48 inch including Composite Wrapping Works in various areas of ADNOC Onshore Fields.

Client: ADNOC Onshore

Status: ongoing

Modification in HDPE Fire Network and Construction of Valve Pits, Installation of New Valves to Mitigate Frequent Failures in Fire Water Network at Das Island Airport Area

Client: ADNOC Offshore

Status: ongoing

Supply and Installation of non-metallic Piping/ Pipeline (GRE-GRP-RTR-FRP-HDPE) at ADNOC Gas Processing - All Sites.

Client: ADNOC Gas Processing

Status: ongoing

Mechanical and Piping Maintenance Works at Various ADNOC Distribution Facilities across UAE

Client: ADNOC Distribution

Status: ongoing

Electrical and Instrumentation Maintenance Works at Dolphin Energy Stations and Pipeline Corridor all over UAE

Client: Dolphin Energy

Status: ongoing

IMI CCI Engineering Services for Critical Control Valves

Provide an advanced engineering development program for imi cci Critical Control valves and predictive maintenance. Program shall includes the study for critical control valves troubleshooting with and without tools.

Client: ADNOC LNG

Status: ongoing

Pipeline Network Critical Rehabilitation Works, Emergency call out and Miscellaneous.
Maintenance Services (EPRS)

The scope of work includes Pipeline sections replacement, In-Service Welding of Full Encirclement Sleeve, Refilling of Odorizer, Maintenance Services for Cyclone Separators, Welding/cutting & Repair Jobs at Site, Fabrication & welding works in CONTRACTOR workshop. 

Client: ADNOC Gas Processing

Status: ongoing

Catalyst Replacement Services in Pipeline Network Division & Catalyst and Molecular Sieves Replacement at AGP Bu-hasa

Client: ADNOC Gas Processing

Status: ongoing

Right of Way Maintenance Works at Dolphin Energy Stations and Pipeline Corridor all over UAE.

Client: Dolphin Energy

Status: ongoing

The GRE Piping Repair Services

Repair of GRE-GRP-RTR-FRP piping and pipeline services.

Client: ADNOC Sour Gas

Status: ongoing

Procurement, Fabrication of Jacketed Piping for Restoration & Revamp of Nitrogen Plant 10 at Das Island

Client: ADNOC LNG

Status: ongoing

BOG - Modification works

Modification works includes civil foundation removal, installation of new foundation, structural work, fireproofing, compressor commissioning assistance.

Client: Linde

Status: ongoing

Unloading & Loading of Clay in 214-D-008A/B Clay Filter at Condensate Unit in RR-III

Client: ADNOC Refining

Status: ongoing

Refurbishment of Warehouse at P&TOD – Musaffah

Refurbishment of Warehouse including solar, area development and interlock lock works etc.

Client: ADNOC Refining

Status: ongoing

Engineering, Procurement and replacement of Steel Handrails and Gratings with FRP (Non-Metallic) at Trains 1 & 2 Seawater Intake Plant 42 in Das Island

Client: ADNOC LNG

Status: ongoing

Engineering, Procurement and Supply and Installation of Polishing Coalescer Vessel including associated Civil, Piping, Electrical and Instrumentation Works at PDH PSA Inlet (Ruwais)

Client: ADNOC Refining

Status: ongoing

Provision of Site Construction Support Services

Service Contracts from Contractor the in Projects division within ADNOC GAS to provide effective support to the Company in the existing and future projects portfolio at various stages to meet expected delivery time and to manage and execute the projects from inception to operations in-line with ADNOC VAP and General Engineering Standards & International Codes and Standards.

Client: ADNOC LNG

Status: ongoing

Mechanical Works (Piping & Structural) of Train-1 Pre-Shutdown & Shutdown Works of ADNOC Gas Processing - Ruwais Capacity Enhancement of NGL Trains 1, 2, 3 & 4 - PROJECT NO.5289

Piping and Structural work of NGL Train-1 Pre-Shutdown & Shutdown Works of ADNOC Gas

Client: ADNOC Gas / Larsen & Turbo

Status: ongoing

Replacement of Potable, Raw & Water Utility Tanks at Asseifiya Islannd , UZ

6 Nos. GRP tanks were installed at Asseifiya Island (ASI), UZ for Potable water, Fire/utility water and Raw water as part of AUP. Inspection was carried out and found corrosion on structural material, bolts, leaks and cracks on GRP panels. COMPANY intends to replace like to like tanks to maintain integrity of the system.

Client: ADNOC Offshore

Status: ongoing

Specialist Support Services for Commissioning Services (IGD-E2 Project) at Das Island

Client: ADNOC LNG

Status: ongoing

HDPE Pipeline Integrity related works including design and procurement (50 mm to 2000 mm) at various locations.

Client: ADNOC Group

Status: ongoing

Pipeline and Systems Maintenance including Electrical and Instrumentation Works at Dolphin Energy Stations Pipelines all over UAE.

Client: Dolphin Energy

Status: ongoing

Unloading of Clay from Clay Filters (214-D-008 A & B- Two Vessels), Transportation of Clay to RIWHF / BeAAT, Dismantling of all internals for cleaning and inspection, Clean weld joints of the distributor pipes and supports preferably by power brush and offer for inspection, Clean/Replace outlet Johnson screen, Fixing back all internals after thorough cleaning and inspection clearance, Loading of Clay as per process engineering procedure

Client: ADNOC Refining

Status: completed

Modification of civil foundations, dismantling, installation of new foundation, structural work, fireproofing, compressor commissioning assistance.

Client: Linde / BOROUGE

Status: completed

Piping & Structural works of Train-1 Pre-Shutdown & Shutdown Works of ADNOC Gas Processing - Ruwais Capacity Enhancement of NGL Trains 1, 2, 3 & 4 - PROJECT NO.5289

Client: Larsen & Toubro

Status: completed

Piping & Structural works of Train-2 Pre-Shutdown & Shutdown Works of ADNOC Gas Processing - Ruwais Capacity Enhancement of NGL Trains 1, 2, 3 & 4 - PROJECT NO.5289

Client: Larsen & Toubro

Status: completed

ADNOC Borouge Ruwais Plant Modification works including Procurement and Construction consisting of Civil, Structural, Piping, Electrical and Instrumentation Works at 17 various locations.

Client: Borouge

Status: completed

Dismantling, Transportation, Erection and Tie ins of Desalter 2 Nos (160 Ton) from ADR to Ruwais Refinery - 3 and 14" pipeline between crude transfer pump discharge and battery limit of desalter package including associated Civil, Electrical and Instrumentation Works

Client: ADNOC Refining

Status: completed

Procurement and Construction for Upgradation of Piping works in OAG Off Gas Piping to PI-26 at Das Island.

Client: ADNOC LNG

Status: completed

Engineering, Procurement and Construction for New Conveyor System at Green Coke Shipping Facility including Installation, Structural building, Electrical and Instrumentation works at Ruwais.

Client: ADNOC Refining

Status: completed

Engineering, Procurement and Construction for the Replacement of Instrument Air Compressor (K-5102) at F1

Client: Fertil

Status: completed

Civil and Structural Works at SNOC Jetty including under water diving works at Hamriyah Port, Sharjah

Client: Sharjah National Oil Corporation (SNOC)

Status: completed

Process Plant Area Lifting with Polymer Injection at Fertil Ruwais.

Client: Fertil

Status: completed

Engineering, Procurement, Construction and Commissioning of Service Water Pump Station in Port of Fujairah.

Client: Port of Fujairah (POF)

Status: completed

Engineering, Procurement and Construction Works including Civil, Mechanical, Electrical and Instrumentation works at all Abu Dhabi Ports in UAE

Client: Abu Dhabi Ports

Status: completed

Inspection and Maintenance Services for Gas Pipeline and Stations - Total Energy Ruwais

Client: Total Energies

Status: completed

Structural integrity study and revamping of civil foundations and supports at Shams Power Plant

Client: SHAMS

Status: completed

CCM Mould Oscillation Main Inlet & Outlet Pipe Installation in SMP1

Client: Emirates Steel

Status: completed

CO2 Reboiler Revamping in DPR1

Client: Emirates Steel

Status: completed

New CCM Cooling Bed Rakes Installation and Profile Maintenance at SMP1 at Mussaffah.

Client: Emirates Steel

Status: completed

Fabricate, Reverse Engineering, Supply & Install Hypochlorite Tank’s Manway as Das Island

Client: ADNOC LNG

Status: completed

Modification of Monorail and Strengthening of Structures for EOT Cranes at TT1 and TT2 transfer towers in Habshan Plant

Client: ADNOC Gas Processing

Status: completed

Replacement of cladded line in Process Gas Separator including Demolition and Installation of 36inch line in DPR1.

Client: Emirates Steel

Status: completed

Design, Procurement and Installation of Explosion Proof Blast Egress in Habshan-5 & Sulphur Plant.

Client: ADNOC Gas Processing

Status: completed

Engineering and Design of Electrical and Instrumentation Cables with adequacy checking of existing pipe racks.

Client: Emirates Steel

Status: completed

Procurement and installation of Electrical Power and Instrument Cables at ADNOC Gas Processing at Stacker/Reclaimer 2200 - SR2200 in RSHT (Ruwais)

Client: ADNOC Gas Processing

Status: completed

Engineering, Supply and Installation, Testing and Commissioning of Lighting System at Al Ain Zaker Depot and LPG Plant

Client: ADNOC Distribution

Status: completed

Automatic Ventilation Facility Supply and Installation in Urea Bulk Storage in Fertil at Ruwais.

Client: Fertil

Status: completed

Detailed Engineering for Modification of Deluge Piping in LNG Train 3 (Das Island)

Client: ADNOC LNG

Status: completed

Engineering, Procurement, Construction and Commissioning of Fresh Water Pump Station including Pump Control System , Electrical and Instrumentation works and Pipeline/Piping works.

Client: Port of Fujairah (POF)

Status: completed

Fire Protection System and Big Flow Monitoring System at Musaffah Terminal.

Client: ADNOC Refining

Status: completed

Hydrogen Recovery Unit Piping Tie-in Works During Turnaround-2023 in FERTIL Ruwais Plant

Client: FERTIL

Status: completed

Upgradation of Hastelloy, CS and GRP/GRE Piping in Hypochlorite Plant Area at Das Island.

Client: ADNOC LNG

Status: completed

Engineering, Procurement, Construction and Commissioning of Fire Water System Upgradation including Demolition of existing Pipeline, Construction of New Valve Chambers and Installation of New GRE Pipeline.

Client: DUGAS/ENOC

Status: completed

Piping and structural works for Train-2 shutdown

Shutdown Structural and Piping Works at Ruwais Plant

Client: ADNOC Gas / Larsen & Toubro

Status: completed

Facility Infra-Structure Upgradation at ADNOC Gas Processing Plant in Ruwais.

Client: ADNOC Gas Processing

Status: completed

Replacement of High-Pressure Gas Pipeline, Residual Gas Pipeline and Pressure Gas Pipeline and associated Tie-ins in ADNOC Gas Processing at Bu-hasa.

Client: ADNOC Gas Processing

Status: completed

Design, Procurement and Installation Works associated with Pipeline integrity of 30" and 36" Gas Pipeline and ADNOC Gas Processing Habshan

Client: ADNOC Gas Processing

Status: completed

Upgradation of GRP/GRE Piping in Hypochlorite Plant (Plant-42) area at Das Island.

Client: ADNOC LNG

Status: completed

Specialist Support Services for IGD Train 2 and OAG Train 1 Turnaround 2021 - 2022 at ADNOC LNG Das Island

Client: ADNOC LNG

Status: completed

Design, Supply and Installation of Heavy-Duty Rack System in Borouge Warehouses and associated Civil Works (Ruwais)

Client: Borouge

Status: completed

Engineering, Procurement, Construction and Commissioning including Supply and Installation of Chemical Treatment System and associated Civil, Electrical and Instrumentation Works.

Client: ADNOC Refining

Status: completed

Construction of PAD-104, WB-122, WB-123 & WB-124 including Erection of equipment, Piping, Structural, Pre-commissioning and Commissioning works at Habshan.

Client: ADNOC Onshore / CPECC

Status: completed

Construction of MP-132, WB-137, WB-125 & WB-126 including Erection of Equipment, Piping, Structural, Pre-commissioning and Commissioning at Habshan

Client: ADNOC Onshore / CPECC

Status: completed

Construction of Remote Degassing Station (RDS-8 and RDS9) including prefabrication and erection of piping (CS, SS, DSS) equipment and Tie in works at Habshan field.

Client: ADNOC Onshore / CPECC

Status: completed